Weekly Roadwork Report – TxDOT Atlanta District For April 19-25
When traveling across the region this week be advised of several road projects that are underway. Slow down in the work zone areas and be on the lookout for road crews.
Bowie County
SH 8 – At Sulphur River, replacing bridges.
FM 559 – Between College Drive and Robison Road, installing sidewalks.
FM 1398 – Under I-20 in Hooks, replacing guard rails. Traffic restricted to one lane.
Cass County
SH 8 – At Sulphur River, replacing bridges.
Harrison County
I-20 – From SH 43 to Gregg County Line, conducting preventative maintenance work on bridges.
SH 43 – From Loop 390 to Haggerty Creek, repairing and resurfacing highway.
Morris County
SH 49 – From Titus County Line to FM 144, repairing and resurfacing highway.
Panola County
SH 149 – At SH 315, constructing overpass and widening highway.
US 59 – At SH 149 interchange, concrete pavement replacement. Westside entrance and exit ramps closed. Detours in place.
US 79 – From FM 31 to Louisiana State Line, resurfacing highway.
Titus County
SH 49 – From FM 1735 to Morris County Line, repairing and resurfacing highway.
Upshur County
US 271—From Camp County Line to 0.5 miles north of FM 2088, resurfacing highway.