TxDot Weekly Road Report for August 17-21
Road work on I-30 is set to begin this week through Texarkana but there are other road work projects still ongoing in several surrounding counties.
Bowie County
I-30 – From FM 989 to Arkansas State Line, widening highway. Construction work will begin on shoulders with most of the work being conducted at night.
SH 8 – At Sulphur River, replacing bridges.
SH 93 – Between Meadow Lane and Kennedy Lane, installing sidewalks.
Cass County
SH 8 – At Sulphur River, replacing bridges.
Harrison County
US 59 – From FM 1997 to Marion County Line, repairing and resurfacing highway. Traffic restricted to one lane in each direction.
SH 43 – From Loop 390 to Haggerty Creek, repairing and resurfacing highway.
Loop 390 – From US 59 to SH 43 North, repairing and resurfacing highway. Road closed to through-traffic, a detour route is signed.
FM 1186 – From US 59 to Panola County Line, installing safety end treatments on culverts.
FM 31 – From FM 2625 to FM 451, seal coating highway.
Marion County
US 59 – From 1.5 miles south of FM 2208 to Harrison County Line, repairing and resurfacing highway. Traffic restricted to one lane in each direction.
Morris County
SH 49 US 79 – From FM 31 to Mill Creek, seal coating highway. – From Titus County Line to FM 144, repairing and resurfacing highway.
Panola County
SH 149 – At SH 315, constructing overpass and widening highway.
US 79 – From SH 149 to Rusk County Line, repairing and resurfacing highway.
US 79 – From FM 31 to Mill Creek, seal coating highway.
SH 149 – From FM 124 to FM 959, seal coating highway.
FM 699 – From Bus. 79 to FM 2517, seal coating highway.
FM 10 – From Bus. 79 to FM 2517, seal coating highway.
US 59 – From FM 2517 to FM 999, seal coating highway.
Titus County
SH 49 – From FM 1735 to Morris County Line, repairing and resurfacing highway.
SH 11 – At Piney Creek, repairing the bridge.
Upshur County
US 271—From Camp County Line to 0.5 miles north of FM 2088, resurfacing highway.