Weekly Roadwork Report – TxDOT Atlanta District For Oct. 6-12, 2019
Traveling across the region this week be advised of road construction that continues in our region.
Bowie County
SH 8 – At Sulphur River, replacing bridges.
Cass County
FM 3129 – From US 59 to SH 77, resurfacing highway.
SH 8 – At Sulphur River, replacing bridges.
Harrison County
SH 43 – at I-20 overpass, conducting preventative maintenance work on overpass.
Loop 281 – at I-20 overpass, conducting preventative maintenance work on overpass.
FM 451 – From 0.6 mile east of FM 31 to FM 9, resurfacing highway.
I-20 Frontage Road – From US 259 to Loop 281, repairing and resurfacing highway.
SH 43 – From Loop 390 to Haggerty Creek, repairing and resurfacing highway.
Morris County
SH 49 – From Titus County Line to FM 144, repairing and resurfacing highway.
Panola County
SH 149 – At SH 315, constructing overpass and widening highway.
US 79 – From US 59 to Mill Creek, resurfacing highway.
US 59 – at SH 149, concrete pavement replacement. East side entrance and exit ramps closed. Detours in place.
Titus County
US 271 – At Ripley Creek and Ripley Creek Relief, replacing bridges.
FM 899 – At Dragoo Creek, replacing bridge. Highway closed to through-traffic.
SH 49 – From FM 1735 to Morris County Line, repairing and resurfacing highway.
Upshur County
US 259 – From FM 557 to SH 155, repairing and resurfacing highway.
SH 155 – From US 259 to 5 miles south of US 259, resurfacing highway.